SN Clients Project Scope of Works Approx. Value, US $
1 Hazama Ando Corporation Nagdhunga Tunnel Construction Project  Fabrication and Transportation of Complete Set of Steel Ribs for Main and Evacuation Tunnel NRs. 94,515,209.00
2 Sanjen Jalavidhyut Co.Ltd. 14.5 MW Sanjen (Upper) Design, Supply, Manufacturing and installation of Penstock Pipes and HM Equipment USD 135,868
NRs.230,775,728.00
3 Synergy Power Development Ltd. 9.6MW Siprin Khola Power Plant Mnaufacturing, Repairing and Installation of Hydro -mechanical components damaged by recent Quake 200000
4 Marusin Sitaka Corporation Rani Jamara Kuleria Manufacturing and Installation of Stoplogs 1200000
Butwal Power Company Ltd. 9.4 MW Andhi Khola Project (Upgrading) Design, supply, manufacturing and installation of Penstock pipes and HM Works 1160000
5 DoLIDAR, Govt. of Nepal Shani–Bheri Motorable Steel Truss Bridge Fabrication and Erection of Shani – Bheri Motorable Steel Truss Bridge 230000
6 Synergy Power Deve. Pvt.  Ltd. 10 MW Siprin Khola Hydro-mechanical Equipment works 420000
Nyadi Group Pvt. Ltd. 5 MW Siuri Khola Hydro-mechanical Equipment works 600000
7 Kathmandu University Turbine Test Lab Supplying, Installation and Commissioning of Hydro-mechanical equipment 390000
8 Nepal Electricity Authority 70 MW Marsyangdi Hydropower Station Design, supply and installation of hydraulic gate parts 80000
Himal Dolakha HP Co.  Pvt. Ltd. 4.5 MW Lower Mai Hydropower Project Penstock Pipes and HM equipment 610000
9 Nepal Electricity Authority Sindhu Dolakha D/Line Extension  Supplying of steel telescopic poles 180000
10 DDC, Dhading, GoN Timilsena Gaun-Dangal Danda Suspended Bridge  Design, Fabrication and delivery of Steel Parts 38000
KAAA, Pokhara Micro Hydropower 45 and 15 kW MH & EM equipment 80000
11 ANK Construction / Dept of Road, GoN Rapti Bridge, Nepalgunj - Bhagauda Road Fabrication and erection of steel truss 6 x 50m  span bridges 170000
12 Andritz Hydro GmbH, Austria 70 MW Middle Marsyangdi, Lot HSS Fabrication and erection of Penstock Pipes of 5.5m dia & 450m long, total 1,800 tons 680000
MCE Industrietechnik  GmbH & Co, Austria Erection of Hydraulic gates, Trashracks, Stoplogs and structures – 1,800 tons 590000
13 Andritz Hydro GmbH, Austria  Fabrication of Hydraulic gates, trashracks and structures, total 1,800 tons 680000
14 Khudi Hydropower Ltd. 4 MW Khudi Hydro- mechanical works and 2.5 km Penstock Pipes 970000
Voith Siemens GmbH, Germany 70 MW Middle Marsyangdi, Lot M Fabrication of  Draft Tube Lners, Spiral Casings, Stay Rings and pit liners for 2 x 35 MW vertical Francis Turbines  200000
15 Rairang Hydropower Dev. Co. Pvt. Ltd. 500 kW Rairang Fabrication, erection, testing and commissioning of Manifold, Penstock Pipes 114000
16 Shakti Hardwares/ Dept of Road, GoN Rapti Bridge, Dang Fabrication and erection of steel truss 7 x 48m long bridges, total 7 x 120 tons 170000
Chilime Hydropower Co. Ltd. 20 MW Chilime, Lot HMW Design, manufacture and erection of gates, stoplogs and trashracks.   270000
17 Larsen and Toubro Ltd., India 20 MW Chilime, Lot C Manifold, Y-type Bifurcation and penstock Pipes 1000000
18 Nepal Electricity Authority 6.2 MW Puwa Design, manufacturing and installation penstock pipe and HM Equipment 660000
DSD Noell GmbH, Germany Kali Gandaki “A”, Lot 4 Fabrication of sluice way steel liners, Extension of Sluice way liners and bulkheads
19 Himal Hydro & General. Construction Ltd. Mankamana  Cable Car  Fabrication of 20 sets of steel towers (15 - 45 m high) for cable car system 160000
20 Butwal Power Company Ltd. 12 MW Jhimruk HM, EM  equipment and 15 and 3 MVA Transformers including 132 kV switchyard  1330000
Butwal Power Company Ltd. 5.1 MW Andhikhola Design and Manufacturing of Hydro-mechanical equipment 1050000
21 Installation and commissioning of HM and EM  equipment